What is the best solution to save manufacturing time:
- Potentially several production workers for each workcenter line in MO
- Possible interruption in the manufacturing step
The module mrp_operations only save the delay between 'stop date' and 'start date' : it's not the real working time
which are the better ways :
- connection with timesheets
- connection with another model
which modules
thanks
↧